PROJECT · BATHROOM
Forest Hills · 7 days · $16,400 fixed

BEFORE

AFTER
THE PROBLEM
A tub under a sloping roof nobody could stand up in; a shower was the only way to use the room.
WHAT WE DID
Tub out, linear drain in the floor, walk-in glass panel, large-format tiles, towel radiator on the heating loop.
RESULT
7 days, $16,400, exactly the quote.
WHAT WE DID, LINE BY LINE
Top-floor bathroom strip-out
Walk-in shower with a linear drain
Wall and floor tiling
Exhaust fan and new lighting
Sealing and final pressure test
WHAT THE OWNER SAID
“Slightly late on a Friday afternoon, but they called ahead. Price exactly as quoted.”
Andrew Simmons · Forest Hills · Plumbing · April 2026
DISTRICT
Forest Hills
DURATION
7 days
FIXED PRICE
$16,400 fixed
TRADES
Plumbing + tiling
GUARANTEE
12 months, in writing