OPEN NOW · MON–FRI 7–18 · SAT 8–14

24/7

EMERGENCY LINE

4.9 ★ · 620 REVIEWS

PROJECT · BATHROOM

Bathroom, panel flat

Bathroom, panel flat

Praha 3 Žižkov · 9 working days · 186 000 Kč fixed

BEFORE

AFTER

THE PROBLEM

1996 bathroom, mould behind the tiles, no ventilation, a cast-iron drain that had been leaking for years.

WHAT WE DID

Full strip-out, new supply and drain runs, walk-in shower, extractor wired to the light switch, underfloor heating mat, inspection report for the new circuit.

RESULT

9 working days, 186 000 Kč, exactly the quote.

WHAT WE DID, LINE BY LINE

Full strip-out and waste removal

New supply and drain runs

Walk-in shower and new sanitary ware

Underfloor heating mat

Extractor wired to the light switch

Inspection report for the new circuit

WHAT THE OWNER SAID

“Bathroom done in nine days as promised. They covered the hallway floor every single morning.”

Petra Nováková · Praha 3 · Bathroom renovation · June 2026

DISTRICT

Praha 3 Žižkov

DURATION

9 working days

FIXED PRICE

186 000 Kč fixed

TRADES

Plumbing + electrical + tiling

GUARANTEE

12 months, in writing

Create a free website with Framer, the website builder loved by startups, designers and agencies.