PROJECT · BATHROOM
Praha 3 Žižkov · 9 working days · 186 000 Kč fixed

BEFORE

AFTER
THE PROBLEM
1996 bathroom, mould behind the tiles, no ventilation, a cast-iron drain that had been leaking for years.
WHAT WE DID
Full strip-out, new supply and drain runs, walk-in shower, extractor wired to the light switch, underfloor heating mat, inspection report for the new circuit.
RESULT
9 working days, 186 000 Kč, exactly the quote.
WHAT WE DID, LINE BY LINE
Full strip-out and waste removal
New supply and drain runs
Walk-in shower and new sanitary ware
Underfloor heating mat
Extractor wired to the light switch
Inspection report for the new circuit
WHAT THE OWNER SAID
“Bathroom done in nine days as promised. They covered the hallway floor every single morning.”
Petra Nováková · Praha 3 · Bathroom renovation · June 2026
DISTRICT
Praha 3 Žižkov
DURATION
9 working days
FIXED PRICE
186 000 Kč fixed
TRADES
Plumbing + electrical + tiling
GUARANTEE
12 months, in writing